This is the gantt chart of Q-Auction.
Gantt chart
The gantt chart of Q-Auction illustrate the list of schedules of doing the activities.
The gantt chart its better to use in doing a thesis and it is very familiar in students. But the use of our new technology there are some ways in to do a new type of scheduling like the mlestone, PERT/CPM
Milestone
The milestone of scheduling the Q-Auction.
A Brief description of mlistone an d ga n tt:
A milestone chart depicts key events along a timescale.
A milestone chart traditionally used triangles to d
epict a specific event.
A milestone on a milestone chart Gantt can depict a
specific event or a culmination of events.
Milestones on a milestone chart Gantt can be shown in various colors or with markings that indicate status.
A milestone chart Gantt is usually used for top level reporting so management does not become bogged down in the minutia of the project or projects.
The PERT and CPM
Planning through scheduling by the use of PERT and CPM:
The project planning process consists of the following:
- Setting the project start date
- Setting the project completion date
- Selecting the project methodology or project life cycle to be used
- Determining the scope of the project in terms of the phases of the selected project methodology or project life cycle
- Identifying or selecting the project review methods to be used
- Identifying any predtermined interim milestone or other critical dates which must be met.
- Listing tasks, by project phase, in the order in which they might be accomplished.
- Estimating the personnel necessary to accomplish each task
- Estimating the personnel available to accomplish each task
- Determining skill level necessay to perform each task
- Determining task dependencies
- Which tasks can be done in parallel
- Which tasks require the completion of other tasks before they can start - Project control or review points
- Performing project cost estimation and cost-benefit analysis
PERT/CPM
CPM (Critical Path Method) and PERT (Programme Evaluation Review Technique) are project management techniques, which have been created out of the need of Western industrial and military establishments to plan, schedule and control complex projects.
PERT
Is a method to analyze the involved tasks in completing a given project, especially the time needed to complete each task, and identifying the minimum time needed to complete the total project.
CPM
The CPM schedule for Q-Auction. It is discussed the critical path method of the events.
In the use of PERT/CPM the thesis group choose the best type of scheduling and learn how to use it.
COST PRESENTATION
The thesis group cost begins in planning and development of the project.
It is a well known project management tool and it consists in "a display of cumulative costs, labor hours or other quantities plotted against time".The na me derives from the S-like shape of the curve, flatter at the beginning and end and steeper in the middle, because this is the way most of the projects look like.
The S curve can be considered as an indicator and it's used for many applications related to project management such as: target, baseline, cost, time etc. That's why there is a variety of S Curves such as:
-Cost versus Time S Curve;(appropriate for projects that contain labour and non-labour tasks).
-Target S Curve;(This S Curve reflects the ideal progress of the project if all tasks are completed as currently scheduled)
-Value and Percentage S Curves;(Percentage S Curves are useful for calculating the project's actual percentage complete)
-Actual S Curve;(This S Curve reflects the actual progress of the project to date)
In order to be able to generate a S Curve, A Baseline and Production Schedule are necessary because they contain important information for each task: -the Baseline - contains information about Actual Start date and finish date.
The Baseline - can also contain information about Man Hours and costs.
The Production Schedule contains information about the actual percentage complete.
The S-curve discussed illustration of the Q-auction Cost and the Actual cost.